The construction work of the warehouse building was focused on the creation of a durable, frost-resistant and robust infrastructure. First, work was carried out on the installation of a protective layer against frost, which ensures the resistance of surfaces to temperature fluctuations. They were followed by the preparation of the crushed stone base and the installation of the sieve layer — all these steps were carried out precisely to guarantee the stability of the soil. For environmental management, lawn edges and pavement (750 m²) were installed, and the final highlight was the installation of 1450 m² concrete street sidewalks on a C12/15 concrete base. With these works, not only a functional, but also an aesthetically tidy space was created.