The River Hall project, 60 Jonavos St., was equipped with 2100 m² of concrete pavement. Work began with the preparation of a highly accurate base, which ensures the stability and durability of the coating. Subsequently, asphalting works were carried out, which improved traffic conditions. For efficient drainage of water, storm engineering networks are installed. In addition, parking spaces were marked and other welfare works were implemented, which contributed to the creation of an aesthetic and functional environment.